Infrastructure
Track geometry, switches, rails, sleepers, ballast, structures: RAILMIND answers with the exact tolerance, the reference and the page, then says what to do and how urgently.

Typical questions
References involved
- TSI INF (EU) 1299/2014
- EN 13848
- IN 3012 / IN 0294
- 49 CFR 213 (FRA)
- UIC leaflets 714, 719
Public texts are in the RAILMIND corpus; your internal instructions and manuals are added in your space for page-level sourced answers.
Use cases
- 01
Geometry survey
Paste a measurement survey: out-of-tolerance points are ranked, the maintenance action prioritised.
- 02
Rail defect diagnosis
Photo of a crack or defect: probable nature, checks to perform, speed-restriction decision.
- 03
Work preparation
Procedure, prerequisites, hold points and records to produce, sourced in your reference.
Note excerpt
Source ou SilenceGauge tolerance in a curve at V ≤ 160 km/h?
Nominal gauge 1435 mm; in maintenance, typical range −3 / +20 mm (to verify) per TSI INF and IN 3012. Decision: gauge check before restoring speed.
RAILMIND expertise · references to consult: TSI INF, IN 3012

