Skip to main content
RAILMIND
Sectors

Infrastructure

Track geometry, switches, rails, sleepers, ballast, structures: RAILMIND answers with the exact tolerance, the reference and the page, then says what to do and how urgently.

Infrastructure — Track, structures, plans and maintenance analysis.

References involved

  • TSI INF (EU) 1299/2014
  • EN 13848
  • IN 3012 / IN 0294
  • 49 CFR 213 (FRA)
  • UIC leaflets 714, 719

Public texts are in the RAILMIND corpus; your internal instructions and manuals are added in your space for page-level sourced answers.

Use cases

  • 01

    Geometry survey

    Paste a measurement survey: out-of-tolerance points are ranked, the maintenance action prioritised.

  • 02

    Rail defect diagnosis

    Photo of a crack or defect: probable nature, checks to perform, speed-restriction decision.

  • 03

    Work preparation

    Procedure, prerequisites, hold points and records to produce, sourced in your reference.

Note excerpt

Source ou Silence

Gauge tolerance in a curve at V ≤ 160 km/h?

Nominal gauge 1435 mm; in maintenance, typical range −3 / +20 mm (to verify) per TSI INF and IN 3012. Decision: gauge check before restoring speed.

RAILMIND expertise · references to consult: TSI INF, IN 3012